
Field Installation
Loudspeaker is inspected after its installation.

Cabinet Wiring
In Paris, wiring specialist Gérard Delzanno prepares cabinets for a major attraction.

Zokkon Coaster
FujiQ's Zokkon Coaster features a unique on-board sound and lighting system.

Legoland Korea getting ready
Coordinator Jungmi Kim communicates with the team before Legoland Korea's grand opening.

Sound System Tuning
Advanced acoustic measurement tools used to fine-tune the sound system for a major attraction in Paris.

Cabinets Assembly
Cabinets are being assembled in France. They will soon control the lighting of a major attraction.

Lighting Programming
Lighting programming takes place at night at Madame Tussauds Tokyo.

Site wiring
Engineer Michel Biettmann connects fiber optic wires in a major attraction in Hong Kong.

On Board Audio Tuning
Movie Park Germany "Studio Tour" coaster vehicles are prepared for Sound Tuning.

OBA Tuning
Sound system is adjusted on Warner Park "Gotham City Escape" in Spain.

Soundtrack Mix
Maestro Patrice Peyrieras and Engineer Michel Biettmann reflect on sound mixing strategy in Korea.

Lighting Control
Lighting Control System in a major attraction in Tokyo.

Show Programming
Preshow being programmed at FujiQ in Japan.

Lighting Design
The preshow room of the Namazu coaster at Vulcania features a vibrating floor and intricate lighting.

BGM sound mixing
"Mixing Cart" used at Legoland Korea to mix Area BGM.

Live Show Installation
Installation Technician Gaku Uchida works on stage lighting system at Legoland Japan.

Splash-o-Saure
The Parc du Bocasse attraction features special effects and an original soundtrack.

Custom LED screen
Field technician Benjamin Delhoume installs custom modules on a large LED screen.

Last Check
In Japan, Engineer Brenda Ho checks cabinets that are going to be used in an upcoming attraction

On-Board system Tuning
Engineer Mayumi Saegusa checks FujiQ's Zokkon train sound system.