
Last Check
In Japan, Engineer Brenda Ho checks cabinets that are going to be used in an upcoming attraction

Legoland Korea getting ready
Coordinator Jungmi Kim communicates with the team before Legoland Korea's grand opening.

OnBoard System Testing
In Japan, engineer Ryu Suzuki test the charging system for a roller coaster sound system

Cabinets Assembly
Cabinets are being assembled in France. They will soon control the lighting of a major attraction.

Live Show Installation
Installation Technician Gaku Uchida works on stage lighting system at Legoland Japan.

On-Board Audio Assembly
Onboard audio assemblies are inspected by engineers in Paris before undergoing tests

Soundtrack Mix
Maestro Patrice Peyrieras and Engineer Michel Biettmann reflect on sound mixing strategy in Korea.

Custom LED screen
Field technician Benjamin Delhoume installs custom modules on a large LED screen.

Splash-o-Saure
The Parc du Bocasse attraction features special effects and an original soundtrack.

On-Board system Tuning
Engineer Mayumi Saegusa checks FujiQ's Zokkon train sound system.

Lighting Programming
Lighting programming takes place at night at Madame Tussauds Tokyo.

OBA Tuning
Sound system is adjusted on Warner Park "Gotham City Escape" in Spain.

Lighting Design
The preshow room of the Namazu coaster at Vulcania features a vibrating floor and intricate lighting.

BGM sound mixing
"Mixing Cart" used at Legoland Korea to mix Area BGM.

Cabinet Wiring
In Paris, wiring specialist Gérard Delzanno prepares cabinets for a major attraction.

Show Programming
Preshow being programmed at FujiQ in Japan.

Zokkon Coaster
FujiQ's Zokkon Coaster features a unique on-board sound and lighting system.

Sound System Tuning
Advanced acoustic measurement tools used to fine-tune the sound system for a major attraction in Paris.

Lighting Control
Lighting Control System in a major attraction in Tokyo.

On Board Audio Tuning
Movie Park Germany "Studio Tour" coaster vehicles are prepared for Sound Tuning.

Field Installation
Loudspeaker is inspected after its installation.

Site wiring
Engineer Michel Biettmann connects fiber optic wires in a major attraction in Hong Kong.